
Your carbon footprint is now a compliance number.
UAE law now requires companies to measure, report and reduce their greenhouse-gas emissions, in free zones as well as on the mainland. Mizan Carbon explains what the law asks of your company, when it applies and what it takes to get ready, from the official text and government sources.
Written for owners, CFOs and operations heads of companies with 20 to 500 employees.
Where the law stands
Checked
- Done:
The Climate Law takes effect
- Done:
Original one-year compliance window ends
- Done:
Cabinet Resolution No. 147 of 2026 extends the window by one year
- Upcoming:
New compliance date. Designated Sources report on the Ministry's approved forms
What changes
- Bills in five inboxesbecomesOne monthly upload
- Spreadsheet guessesbecomesDocumented factors
- Waiting for guidancebecomesA 12-month baseline
- Verifier questionsbecomesAn evidence file ready
The numbers that matter to you
Every figure on this site comes from the law or an official strategy. Each guide lists its sources at the end.
AED 50k–2M
Fine range for breaching the measurement, reporting and record-keeping duties. Doubled for a repeat within two years.
5 years
record retention
How long measured emission records must be kept and shown to inspectors on request.
−47%
by 2035 vs 2019
The UAE's national emissions target, from 196.3 to 103.5 MtCO2e.
2050
net zero
Net-zero target for the UAE, and 100% clean energy for Dubai.
What changed
Three duties that used to be voluntary are now law
The Climate Law took effect on 30 May 2025. It applies to any public or private company, or individual enterprise, whose operations release greenhouse gases into the atmosphere.
Measure
Measure the emissions from your activities regularly and keep an emissions inventory, using the standards set by the Ministry of Climate Change and Environment or your emirate's authority.
Report
Submit periodic reports on approved forms, with your activity data, the reduction measures you have taken or plan to take, and their expected results.
Reduce and record
Take measures to cut emissions in line with Ministry resolutions, and keep the records of your measured emissions for five years.

Why start measuring now
The deadline is now 30 May 2027. A credible year of data takes twelve months.
The Cabinet extended the compliance window by one year. A credible inventory needs about twelve months of operating data, so a company that starts measuring now will barely have a full year in hand by the new date. Those that wait will be estimating under pressure.
Fines and contracts
AED 50,000 to AED 2 million per violation, doubled for a repeat within two years.
Customers are asking
Large companies and government buyers need emissions data from their suppliers.
Cheaper finance
UAE banks have pledged over AED 1 trillion in sustainable finance by 2030.
Lower running costs
Most SME emissions come from electricity, cooling and fuel. Cutting them cuts the bills.
Scope check
Which rules apply to your company?
Pick your sector to start. Five questions, and the result updates as you choose.

The national direction
Where the UAE and Dubai are heading
The Climate Law is the enforcement layer for targets the country has already set. These targets explain why the reporting rules will tighten over time.
- 2019
- 196.3
- 2035
- 103.5
−47% against 2019, with a 79% cut targeted for buildings.
UAE · 2030
0.27
kg CO2 per kWh grid factor targeted. A cleaner grid lowers every company's Scope 2.
Dubai · 2030
~36%
Clean energy share of Dubai's mix, raised from the earlier 25% target.
Dubai · 2050
100%
Of Dubai's energy needs from clean sources.
- How the law enforces these targets
Support you can use
Programmes that lower the cost of going green
Eligibility and intake windows change, so check the current terms with each programme before you apply.
- Abu Dhabi
Up to 75%
Project Decarb 2.0 by Solutions+ (Mubadala) subsidises emissions assessments, energy audits and sustainable procurement.
- UAE-wide
Certified
The National Green Certificates Programme now assesses factories as well as commercial buildings.
- Dubai
Net metering
Shams Dubai lets buildings install rooftop solar and offset exports against their DEWA bill.
- By 2030
AED 1T+
UAE banks' pledge to mobilise sustainable finance, including lending for efficiency projects.
Not sure which of these you qualify for? Request a consultation and an adviser can check the current terms for your company.
How it works
From "are we in scope?" to a filed, defensible report
- Weeks 1–2
Step 1: Scope and boundary
Confirm which rules apply, map your sites and emission sources, and name an owner for each data stream.
- Weeks 2–8
Step 2: Baseline
Collect 12 months of bills and logs, calculate Scope 1 and 2 with documented factors, and flag every estimate.
- Monthly
Step 3: Keep it current
Add each month's bills, check the data, fill gaps and keep the evidence file verifier-ready.
- Month 12 onward
Step 4: Close, plan and file
Prepare the report and evidence pack, have it signed off by an independent verifier, file it, and cost a reduction plan.
Whoever prepares your report should never verify it: an accredited verifier signs it off. Read the guide to GHG reporting
Plain-English guides
Each guide summarises the official text and lists every source.

Who must reportWho must report emissions under the UAE Climate Law?

Find out where you stand in a free consultation.
Tell us about your company and we'll arrange a call with a qualified carbon accountant or ESG adviser. They can tell you which rules apply, outline what a compliant baseline will take, and check which support programmes you could use. No charge and no obligation.
Request aConsultation